Measuring openings and fitting day explained

A fitter always measures the bare structural masonry opening in three places horizontally and vertically before ordering. Swapping a single front door takes half a day; adding sidelights or double doors takes 1 full day.

What a laser survey checks before manufacture and what actually happens in your hallway on installation morning.

Free, no obligation. One local fitter prices it, not five.

  • half a daytypical single door fit time
  • 3 widthstop, mid & base brick check
  • 10 mmstandard fitting tolerance
  • 4–6 wkscustom composite lead time
Two white panelled front doors with diamond-leaded obscure glass panels set in a red brick porch above stone steps

What the surveyor measures before a door is made

Front doors are built millimetre-exact to your house rather than cut down with a saw. Taking rough measurements yourself helps with early pricing, while the installer's formal survey checks hidden traps inside the plaster reveal.

  1. Brick-to-brick width at top, middle and bottom. Older Irish porches frequently lean by 10 mm to 20 mm; the new frame is sized off the tightest structural dimension minus a 10 mm packing gap.
  2. Height from outer cill to underside of lintel. Checked against your internal tile, wooden floor or doormat clearance so the inward-opening leaf never scrapes the hallway floor.
  3. External cill overhang and drip clearance. Confirming whether the new door sits directly on an existing granite step or needs a 150 mm or 180 mm extruded cill with end caps.
  4. Plaster reveal depth and electrical cables. Checking doorbell wires, alarm reed contacts and internal timber architraves before prying the old frame loose.

Price my front door

Four quick taps and our price shows before we ask for a phone number. One local door fitter rings you, not five.

A composite front door, single doorway, solid panel: €1,400 to €2,500, supplied and fitted.

Step 1 of 5

Which front door material?

Pick the closest match. The fitter brings colour swatches and slab samples.

How the price is worked out

The range reflects going Irish supply-and-fit front door prices for that material, opening layout and glazing level, including taking out the old frame, fitting the new door set, sealing and removing waste. Upgrading to a 70 mm double-rebated slab, custom non-standard RAL colours, low Part M mobility thresholds, top fanlights or structural widening alters the final written quote. Eligible pre-2011 homes can deduct €800 per door under the SEAI external door grant where U-value and insulation rules are met. Use this figure to plan: only a fitter who measures the brickwork gives a firm quote.

Hour-by-hour walkthrough of fitting day

1. Protection & frame removal

What happens on site
Dust sheets laid down the hall; old leaf unhinged, old frame saw-cut carefully to protect outer brickwork and inner plaster.

2. Dry-fit, pack & plumb

What happens on site
New outer frame squared with laser level and load-bearing packers; anchored straight into solid blockwork with masonry frame screws.

3. Hang slab & tune compression

What happens on site
Door leaf lifted onto 3D flag hinges; multi-point hooks, keep plates and handle throw adjusted for smooth one-finger latching.

4. Foam, seal & trim finish

What happens on site
Perimeter cavity filled with low-expansion polyurethane foam; exterior weatherproof silicone beaded cleanly; PVC or timber trims fitted inside.

5. Handover & waste removal

What happens on site
Keys handed over, lock operation demonstrated, old door and frame loaded onto the van and hall swept clean.

Survey and fitting questions

Will removing my old front door damage the indoor hallway plaster?

Cutting the old timber or PVC frame into sections keeps plaster disruption minimal. Hairline edges around deep reveals are normally covered cleanly by matching internal architrave trim.

Should I keep my alarm contact when changing the front door?

Tell the surveyor at the measure visit so the fitter leaves a clean channel for the reed contact or alerts your alarm technician to refit the sensor on the new frame.

Can a front door be fitted in rain or winter weather?

Yes, unless there is a severe wind warning. The doorway stays completely open for roughly 45 to 60 minutes while the old frame comes out and the new frame is anchored.

What should I clear from the hallway before the fitters arrive?

Move coats, shoe racks, console tables and fragile porch frames at least 2 metres back from the entrance and clear driveway parking for the van.

All front door pages and guides

Modern horizontal-grooved terracotta front door with a full-length stainless bar handle and a tall dark-framed glazed sidelight

Check your front door figure before anyone rings

Choose material, doorway layout and glazing first. When you want a measured quote, your outline goes to a single door fitter in your county.